MEP WORKS FOR PRIVATE VILLA

Client   : Grey Design Engineering Consultancy Main contractor : MBL Owner    : Al Madinah Region Development Authority Locatio  : Medinah Year        : 2024 Status    : Ongoing Scope of work : MEP -Supply and installation of package units 3&5TR -Supply and installation of plumping works along with sanitary equipment -Design , Supply and installation of electrical works -Design , Supply and installation of smart system for controlling ( lights , AC units , curtains ) -Startup , Testing and commissioning

chiller replacement works in shaza almadinah hotel

Client : Dallah Trading Co Owner : Shaza Almadinah Hotel Consultant : Abdul alrazak Hakeem office engineer consultant Location : Medina Year : 2023 Status : Handed over Scope of works : Chiller replacement -Replacement of exist 8 chillers with new 8 chiller -Replacement of 16 pumps -Replacement of piping network include valves , insulation and cladding -Electrical and CPM works -Startup ,Testing & Commissioning e

vrf system in half million coffee

Client       : Khalid Saud Al Zammam Est.Owner      : HALF MILLION COFFEELocation   : Jeddah – Al-Mohammdiyah dist.Year           : 2023 Status       : Handed over Scope of works  : VRF system -Installation of VRF system 60TR (DAIKN) -Supply and installation of duct works -Supply and installation of electricals works  -Nitrogen flushing -Startup , Testing and commissioning system and related electrical works

Electrical Works in KIDNA Head office

Client      : KIDANA Year         : 2022Location : MekkaScope of work : Electrical -Design of lighting system in KIDANA head office – Makkah ( Mena ).-Supply and installation of lighting device for corridors in 5 floors-Startup , Testing and commissioning   

Fire Fighting Maintenance in POLYONE Factory

Client       : PolyOne FactoryOwner     : JuffaliLocation  : Jeddah – Industrial area Year      : 2022 Status  : handed overScope of work : F.F Maintenance Description : Fire fighting maintenance works for fire fighting networks consist of sprinkler , piping line and deductors 

VRF System in Half Million Coffee

Client       : Khalid Saud Al Zammam Est. Owner      : HALF MILLION COFFEE Location   : Jeddah – Al-Khaldiyha dist. Year           : 2023 Status     : Handed over Scope of works  : VRF system -Installation of VRF system 60TR (DAIKN) -Supply and installation of duct works -Supply and installation of electricals works -Nitrogen flushing -Startup , Testing and commissioning system and related electrical works

Chiller system in mada gypsum factory

Owner      : MADA GYPSUM COMPANYLocation   : Yanbu Year           : 2024 Status      : Handed over Scope of works : HVAC-Supply and installation of Carrier chiller 120TR -Supply and installation of primary pump 300 GPM-Supply and installation of fiberglass tank 16,000 ltr-Supply and installation of electrical works and panels-Supply and installation of piping network along with insulation and cladding-Startup , Testing and commissioning 

Air Conditioning System in TETRA PAK Factory

 Client       : Smart Tracks Owner     : Tetra Pak CoLocation : Jeddah Year          : 2022 Status     : Handed over Description : Installation , testing and commissioning of air conditioning system content of package units and duct split units  and related electrical works.

Chilled Water System in ULKER Factory

Client       : Dallah Trading Co.Owner     : ULKER Co.Location  : Jeddah – Industrial areYear          :  2022Status      : Handed overScope of works : HVAC -Fabrication and installation of chiller platform -Installation of 2 chillers 140TR (TRANE)-Supply and installation of 2 primary water pump 300 GPM along with makeup water pump-Supply , Installation , Insulation and cladding for piping network-Supply and installation of electricals works with looping and panels termination -Startup , Testing and commissioning of chilled water system and electrical works

VRF System-KIDANA HEAD OFFICE

Client       : Dallah Trading Co. Owner     : KIDANA   Location  : Makkah – KIDANA Head office ( Mena)Year          : 2023  Status     : Handed over Scope of works  : VRF System-Installation of VRF units outdoor and indoor 400TR-Supply and installation of duct works -Supply and installation of electrical works ( MDB , MCC )-Nitrogen flushing-Remove of old roof ceiling and install new one-Startup , Testing and commissioning