Emirates Advanced Industry

Client   : Emirates Advanced IndustryLocation  : Jeddah – Third Industrial Dist.Year        : 2025Status    : Handed overScope of work : Design, supply, and installation of a complete Compressed Air and HVAC System, including a Chilled-Water Chiller System for production machinery, ensuring efficient and reliable industrial cooling performance. -Design, supply, and installation of a complete Compressed Air System. –Design, supply, and installation of a HVAC and Chilled-Water Chiller System for production machinery. -Integration of mechanical and electrical systems for efficient operation –Testing, commissioning, and performance verification of all systems -Delivered energy-efficient and reliable cooling and air solutions for production facilities

MEP WORKS FOR PRIVATE VILLA

Client   : Grey Design Engineering ConsultancyMain contractor : MBLOwner    : Al Madinah Region Development AuthorityLocation  : MedinahYear        : 2024Status    : OngoingScope of work : MEP-Supply and installation of package units 3&5TR-Supply and installation of plumping works along with sanitary equipment-Design , Supply and installation of electrical works-Design , Supply and installation of smart system for controlling ( lights , AC units , curtains )-Startup , Testing and commissioning

chiller replacement works in shaza almadinah hotel

Client : Dallah Trading Co. Owner : Shaza Almadinah Hotel Consultant : Abdul alrazak Hakeem office engineer consultant  Location : Medina Year : 2023 Status : Handed over Scope of works : Chiller replacement  -Replacement of exist 8 chillers with new 8 chiller  -Replacement of 16 pumps  -Replacement of piping network include valves , insulation and cladding -Electrical and CPM works -Startup ,Testing & Commissioning

vrf system in half million coffee

Client       : Khalid Saud Al Zammam Est.Owner      : HALF MILLION COFFEELocation   : Jeddah – Al-Mohammdiyah dist.Year           : 2023Status       : Handed overScope of works  : VRF system-Installation of VRF system 60TR (DAIKN)-Supply and installation of duct works-Supply and installation of electricals works -Nitrogen flushing-Startup , Testing and commissioning system and related electrical works

Electrical Works in KIDNA Head office

Client      : KIDANAYear         : 2022Location : MekkaScope of work : Electrical-Design of lighting system in KIDANA head office – Makkah ( Mena ).-Supply and installation of lighting device for corridors in 5 floors-Startup , Testing and commissioning   

Fire Fighting Maintenance in POLYONE Factory

Client       : PolyOne FactoryOwner     : JuffaliLocation  : Jeddah – Industrial area Year      : 2022 Status  : handed overScope of work : F.F Maintenance Description : Fire fighting maintenance works for fire fighting networks consist of sprinkler , piping line and deductors   

VRF System in Half Million Coffee

Client : Khalid Saud Al Zammam Est Owner      : HALF MILLION COFFEELocation   : Jeddah – Al-Khaldiyha dist.Year           : 2023 Status     : Handed overScope of works  : VRF system-Installation of VRF system 60TR (DAIKN)-Supply and installation of duct works-Supply and installation of electricals works -Nitrogen flushing -Startup , Testing and commissioning system and related electrical works  

Chiller system in mada gypsum factory

  Owner      : MADA GYPSUM COMPANY Location   : Yanbu Year           : 2024 Status      : Handed over Scope of works : HVAC -Supply and installation of Carrier chiller 120TR -Supply and installation of primary pump 300 GPM-Supply and installation of fiberglass tank 16,000 ltr-Supply and installation of electrical works and panels-Supply and installation of piping network along with insulation and cladding-Startup , Testing and commissioning 

Air Conditioning System in TETRA PAK Factory

  Client       : Smart Tracks Owner     : Tetra Pak Co Location : Jeddah Year          : 2022 Status     : Handed over Scope of Works :Installation , testing and commissioning of air conditioning system content of package units and duct split units  and related electrical works.

Chilled Water System in ULKER Factory

Client       : Dallah Trading Co.   Owner     : ULKER Co. Location  : Jeddah – Industrial area Year          :  2022   Status      : Handed over   Scope of works : HVAC -Fabrication and installation of chiller platform -Installation of 2 chillers 140TR (TRANE)-Supply and installation of 2 primary water pump 300 GPM along with makeup water pump-Supply , Installation , Insulation and cladding for piping network-Supply and installation of electricals works with looping and panels termination -Startup , Testing and commissioning of chilled water system and electrical works