Chilled Water System in ULKER Factory


Client       : Dallah Trading Co.
 
Owner     : ULKER Co.
Location  : Jeddah – Industrial area
Year          :  2022
 
Status      : Handed over
 
Scope of works : HVAC
-Fabrication and installation of chiller platform 
-Installation of 2 chillers 140TR (TRANE)
-Supply and installation of 2 primary water pump 300 GPM along with makeup water pump
-Supply , Installation , Insulation and cladding for piping network
-Supply and installation of electricals works with looping and panels termination 
-Startup , Testing and commissioning of chilled water system and electrical works